Home | Contact Us | Français | Guest Book | Site Map    


Accomplishments :: Mining
Inco Limited-Skip Wagon
 
Inco Skip WagonRecently designed & fabricated, this wagon is used for the Skip change on Inco Limited property at the Creighton Mine, No. 9 shaft.
 

Falconbridge Limited-Converter Aisle
 
Converter AisleOver the years G.J. Mechanical Ltd. has done numerous work in the Converter Aisle, such as repairs, maintenance & replacements.
 

Falconbridge Limited-#6 Converter Replacement
 
#6 ConverterDuring the 2004 June Shutdown, G.J. Mechanical Ltd. has worked closely in the replacement of the #6 Converter.  This Converter wieghs 80 Tons.
 

Falconbridge Limited-#6 Converter Installed
 
#6 Converter, installed in Converter Aisle at the Falconbridge Smelter.
 

Falconbridge Smelter
 
Erect 2

Platform & stair installation at the Falconbridge Smelter.

 

Falconbridge Limited-Cyclone Modification
 
Cyclone BeforeThis cyclone had to be modified before installation at the Falconbridge smelter.
 

© 2010 G.J. Mechanical Ltd.. All Rights Reserved.
Message to WebMaster | Last Update : September 6 2010