| Inco Limited-Skip Wagon | | | | Recently designed & fabricated, this wagon is used for the Skip change on Inco Limited property at the Creighton Mine, No. 9 shaft. | | |
|
| | Falconbridge Limited-Converter Aisle | | | | Over the years G.J. Mechanical Ltd. has done numerous work in the Converter Aisle, such as repairs, maintenance & replacements. | | |
|
| | Falconbridge Limited-#6 Converter Replacement | | | | During the 2004 June Shutdown, G.J. Mechanical Ltd. has worked closely in the replacement of the #6 Converter. This Converter wieghs 80 Tons. | | |
|
| | Falconbridge Limited-#6 Converter Installed | | | | #6 Converter, installed in Converter Aisle at the Falconbridge Smelter. | | |
|
| | Falconbridge Smelter | | | Platform & stair installation at the Falconbridge Smelter. | | |
|
| | Falconbridge Limited-Cyclone Modification | | | | This cyclone had to be modified before installation at the Falconbridge smelter. | | |
|
|
| |